← All solar market data
Solar Roles Research · Project management

Solar project-management ads are 2.3× more likely to disclose travel

Solar Roles reviewed 404 deduplicated US solar employer-role combinations. Travel requirements appeared in 58.6% of project-management postings, compared with 25.8% of installer and electrical postings.

By Solar Roles ResearchFrozen US job-description snapshot
58.6%
Project-management roles mentioning travel
82 of 140 deduplicated employer-role combinations
25.8%
Installer / electrical roles mentioning travel
68 of 264 deduplicated employer-role combinations
2.27×
Higher disclosure rate
A 32.8 percentage-point gap

Travel requirements were more common in project-management postings

Of the 140 project-management employer-role combinations in the primary sample, 82 disclosed a travel requirement. Among 264 installer and electrical combinations, 68 did so. That works out to 58.6% and 25.8%, respectively.

The measure is limited to language published in the job ad. It captures whether travel was disclosed as part of the role; it does not measure miles traveled, nights away from home, or the schedule employees ultimately worked after hire.

Share of reviewed roles with an explicit travel requirement
Solar project management
82 of 140 employer-role combinations
58.6%
Solar install / electrical
68 of 264 employer-role combinations
25.8%

Primary sample: roles with an explicit solar, PV, BESS, battery or renewable-energy signal in the title and a qualifying project-management or installer/electrical title. Duplicate employer-role descriptions were grouped before calculating the shares.

Examples of travel requirements in project-management postings

The reviewed postings included roles listing 25% travel, 40% travel, minimum 50% travel, and 100% travel. The examples below show the range of language employers used. All headline rates are calculated from the full primary sample.

Travel was also disclosed in 68 installer and electrical combinations. The comparison concerns the frequency of disclosure in each cohort, rather than the presence or absence of travel in either occupation.

Results by collection source

Project-management postings had the higher travel-disclosure rate in both collection streams. Adzuna produced a 59.3% rate for project management and 25.1% for install/electrical. Direct ATS feeds produced rates of 68.8% and 27.3%.

Collection source
Project management
Install / electrical
Adzuna
59.3%
70 of 118
25.1%
58 of 231
Direct ATS feeds
68.8%
22 of 32
27.3%
12 of 44

These source-specific rates are reported separately and are not added together. Cross-source duplicates were merged for the primary 404-role calculation. The direct-ATS project-management sample is smaller than the Adzuna sample.

Project-scale robustness check

Utility-scale postings show a smaller gap

Project scale is a potential source of bias in the main comparison because project-management roles may be more heavily represented in utility-scale construction. We repeated the analysis using only primary-cohort postings that explicitly referenced utility-scale solar, a solar farm, ground-mount solar, or solar EPC work.

Utility-scale-tagged roles with an explicit travel disclosure
Utility-scale solar project management
62 of 88 deduplicated employer-role combinations
70.5%
Utility-scale solar install / electrical
25 of 44 deduplicated employer-role combinations
56.8%
70.5%
Project-management travel disclosure
56.8%
Installer / electrical travel disclosure
+13.7 pts
Remaining gap after controlling for project scale

Travel was disclosed in 62 of 88 utility-scale project-management combinations (70.5%) and 25 of 44 utility-scale installer/electrical combinations (56.8%). The gap falls from 32.8 percentage points in the primary comparison to 13.7 points in this restricted sample.

The utility-scale installer/electrical group contains 44 deduplicated employer-role combinations. This result is included as a project-mix check and should be interpreted with the smaller denominator in mind.

Sensitivity check

Results using a broader title definition

The primary sample requires an energy term in the job title. A second specification also includes generic titles such as “Project Manager” or “Installer” when the description clearly identifies the work as solar.

52.8%
Broader project-management cohort
131 of 248
28.5%
Broader install / electrical cohort
107 of 375

Under the broader specification, 131 of 248 project-management combinations (52.8%) disclosed travel, compared with 107 of 375 installer/electrical combinations (28.5%). The corresponding ratio is 1.85×.

Worker accounts also describe travel as a job constraint

Two discussions in construction-focused Reddit communities describe the same issue from the worker side: project-management and supervisory roles can involve extended periods away from home, with schedules varying substantially by employer and market segment.

Reddit posts are used here as qualitative context only. They were not included in the job-ad counts.

Questions to ask about travel before accepting a solar PM role

Solar project-management postings can include site visits, contractor coordination, commissioning work and assignments at active project locations. A remote designation by itself does not establish how much time the employee will spend at home.

Candidates can ask employers for the typical number of nights away each month, the geographic range of project assignments, whether rotations are fixed, and how the travel percentage in the posting compares with the schedule employees actually work.

Compare the wording in current solar PV installer jobs, solar electrician jobs and solar engineering jobs before treating the title alone as a guide to field time.

How many nights away?

Ask for the typical number of nights away in a month, in addition to the annual travel estimate.

Where are the projects?

Clarify whether assignments involve regional site visits, national travel, or relocation from one project to the next.

What happens between projects?

Ask where the employee is normally based between site assignments and how long those periods typically last.

What is reimbursed?

Confirm the policy for flights, mileage, lodging, per diem, rental cars and paid travel time.

Methodology

How Solar Roles reviewed the postings

Snapshot. The source file contained 3,246 active job records collected by Solar Roles as of September 13, 2026: 2,206 from Adzuna and 1,040 from direct employer ATS feeds.

Primary cohorts. The headline comparison uses project-manager, project-coordinator and construction-manager titles on one side, and installer, electrician, electrical-technician, electrical-foreman, wireman and journeyman-electrician titles on the other. The title also had to carry an explicit solar, PV, BESS, battery or renewable-energy signal, with the description supporting the energy context. Obvious non-solar trades were excluded.

Deduplication. We grouped multi-location copies and duplicate postings before calculating the rates. Employer names, titles and descriptions were normalized for case, punctuation and spacing. Records were merged when the same employer carried the same normalized description, or when the normalized title matched and the descriptions were at least 98.5% similar with comparable length. This also catches small formatting changes introduced during syndication.

ATS–Adzuna overlap. Duplicate postings appearing in both collection paths were merged before the headline calculation. In the final primary cohorts, 21 employer-role combinations appeared in both Adzuna and a direct ATS feed: 10 in project management and 11 in installer/electrical. They count once, not once per feed.

Unit of analysis. The final primary sample contains 404 deduplicated employer-role combinations representing 193 distinct employers across the two cohorts. The two employer counts are not additive because 13 employers appear in both cohorts.

Travel disclosure. A role was counted when the title or description explicitly described travel as required, expected, percentage-based, frequent, regular, occasional, overnight, out-of-town, or tied to required site visits. We did not infer a travel requirement merely because a job was field-based, mentioned travel reimbursement, or involved construction work.

Project-scale check. To test whether the headline gap was mainly a consequence of comparing utility-scale project managers with residential or commercial installers, we reran the comparison inside the primary cohorts using only postings that explicitly referenced utility-scale solar, a solar farm, ground-mount solar, or solar EPC work. After the same cross-source deduplication, 62 of 88 project-management combinations (70.5%) disclosed travel versus 25 of 44 installer/electrical combinations (56.8%).

Title-definition sensitivity check. We repeated the analysis with generic titles accepted when the description clearly established solar work. Travel was disclosed in 131 of 248 project-management combinations (52.8%) and 107 of 375 installer/electrical combinations (28.5%).

Limits. The analysis measures requirements disclosed in job ads. It does not estimate miles traveled, nights away, actual schedules, or whether the published requirements matched working conditions after hire. Jobs without a travel disclosure may still involve travel. The snapshot is a Solar Roles sample rather than a probability sample of every solar job in the United States.